Paul LoPizzo Paul LoPizzo

Non-Engineered Erosion & Sediment Control Documentation: What Small Builders Need to Know (VIC)

Small building projects in Victoria often require non-engineered erosion and sediment control documentation. This article explains the purpose of ESC notes, what they typically include, and how they differ from engineered designs. It provides practical guidance for builders preparing documentation for council review.

Go to: ESC Documentation Services Page

Erosion and sediment control (ESC) is an important aspect of construction, particularly on sites with disturbed soil, slopes or areas close to drainage paths. Councils across Victoria often request documentation demonstrating that sediment controls will be implemented during works.

This article outlines the role of non-engineered ESC documentation, which is the type typically required for small to mid-size building projects. It does not cover engineered ESC plans or hydrological modelling.


What “Non-Engineered” ESC Documentation Means

Non-engineered ESC documentation refers to:

  • Practical site notes

  • Standard control descriptions

  • Basic layout references

  • Housekeeping measures

  • Access management details

It is not a technical or engineered design.
No modelling or hydrological analysis is included.

This is the level of documentation most Victorian councils expect for residential and small commercial projects.


Why Councils Request ESC Documentation

Councils request ESC documentation to confirm that:

  • Sediment will be contained on-site

  • Stockpiles will not enter drainage lines

  • Construction traffic will not spread sediment

  • Soil disturbance remains controlled

  • Basic environmental practices will be followed

The council’s goal is clarity, not engineering detail.


Common Inclusions in Non-Engineered ESC Documents

Typical components include:

Sediment Controls

Common notes include:

  • Silt fencing

  • Sediment traps

  • Ground cover management

  • Containment measures around stockpiles

Site Access

Documentation often outlines:

  • Stabilised access points

  • Vehicle containment measures

  • Management of mud tracking

Stockpile Management

Basic notes covering:

  • Placement location

  • Covering materials

  • Drainage considerations

Drainage Path Protection

Documentation may include descriptions of:

  • Keeping sediment away from natural or constructed drains

  • Basic precautions to avoid runoff

Housekeeping Measures

Usually includes:

  • Daily clean-up

  • Litter and waste containment

  • Temporary storage areas


What This Documentation Does Not Provide

To prevent confusion, it is important to outline the exclusions:

  • No hydrology

  • No engineering calculations

  • No formal ESC design

  • No WSUD elements

  • No stormwater compliance design

  • No certification

This documentation supports compliance but does not replace technical advice where required.


When a Builder Should Seek an Engineer or WSUD Specialist

Escalation may be required if:

  • The site has complex drainage issues

  • There are waterways or wetlands nearby

  • The council specifies engineered controls

  • There are high stormwater sensitivity areas

  • Large commercial/industrial construction is planned

Most single dwellings and small developments do not require engineering involvement for ESC, unless explicitly requested.


Benefits of Clear Non-Engineered ESC Documentation

Small builders benefit from:

  • Fewer council queries

  • Reduced delays before starting work

  • Clear expectations for trades on site

  • Consistency across documents

  • Ability to standardise processes across multiple projects


Conclusion

Non-engineered ESC documentation is a straightforward but important component of many Victorian planning and construction processes. Clear, site-specific notes help reduce council feedback and support practical environmental management on-site.

For more detail on Attera’s ESC documentation services, visit:
Erosion & Sediment Control

Read More